Our highly experienced and dedicated teams can design, construct, and troubleshoot even the most-complex installations and we commit to completing every project to the highest standards through innovative solutions based on your specific requirements.
Con J. Franke installed (2) 19.2kW Blink Chargers Level 2, (1) 24kw ABB Charger Level 2, and (1) 54kw ABB Charger Level 3 at Epic Chevrolet in Sacramento.
New K-8 Grammar School for Stockton Unified. Project consists of 2 new modular classrooms, multipurpose building, and admin/library. Site was powered from new 480V PG&E Service and distributed to associated buildings. Site lighting was installed along with new low voltage systems to the buildings.
Website Contents © Con J. Franke Electric Inc.
Unauthorized duplication or reposting of the contents of this site in any form is strictly prohibited.